Billy Wagner - References
References
References may be made available upon appropriate request.
Please send me an email:
CormorantDesign@gmail.com
For my online resume', see my linked in profile:
http://www.linkedin.com/in/billywagner
Interior Remodel - Renderings
Project: Guest Suite Remodel, Private Residence, New Jersey
Interior Design: Melissa Mascara Design
My Role (2010): 3D Visualization, Renderings, Construction Documentation, FF&E Material Selection Consultant
Private Residence - Part 2
Private Residence - Part 1
Basement Foundation Walls Poured, 9/7/2010
Footings Poured, 8/25/2010
Groundbreaking on Private Residence, 8/16/2010
Part 1: Groundbreaking, Grading, Excavation, Footings and Foundation poured, August and early September, 2010
Project: 3,000 square foot Private Residence, Rural Pennsylvania
My Role (2010): 3D Visualization, Permit Set Consultation, Material Selection, Carpentry
Thomas Properties Leasing Office - Campus El Segundo
Project: TPG Leasing Office, Campus El Segundo, CA
Client: Thomas Properties Group
Architect: RipBang Studios
My Role (2006 - 2008): Senior Designer & Job Captain, Concept Design, Schematic Design, Design Development, Construction Documentation, 3D Visualization & Rendering, Client & Consultant Coordination, Cost Estimating/Value Engineering, LEED Commissioning, Permitting, Construction Administration
LAUSD - Central Region High School #13
Project: Los Angeles Unified School District - Central Region High School No. 13
Architect: HMC Architects
Client: LAUSD
My Role (2010 - ): On-site Construction Administration and Project Closeout Professional
The Los Angeles Unified School District (LAUSD) has several new school projects recently completed and on the boards, and they face many challenges associated with obtaining the required state approvals on many of these newly completed projects.
I have been brought in to assist HMC Architects and LAUSD with the closeout and state approval of new LAUSD Central Region High School No. 13. Currently focused on developing a business strategy to assist LAUSD with the DSA Closeout of other school projects, I am pursuing a career as an Educational Facilities Project Closeout Professional.
Budweiser Draft Zone
Project: Budweiser Draft Zone
Thematic Design: RipBang Studios
My Role (2008-2010): Lead Design, Construction Documentation, Consultant & Client Coordination, Research, Specifications, 3D Visualization & Renderings
Foothill College - Upper Campus, Los Altos, CA
Project: Foothill College - Upper Campus, Los Altos, CA
Architect: Perkins+Will
My Role (2001-2005): Master Planning Presentations, Conceptual & Schematic Design, As-Built Documentation, Limited but continued involvement in Design Development & Construction Documentation
Foothill College - Lower Campus, Los Altos, CA
Project: Foothill College - Lower Campus, Los Altos, CA
Architect: Perkins+Will
My Role (2001-2005): Master Planning Presentations, Conceptual & Schematic Design, As-Built Documentation, Limited but continued involvement in Design Development
Frank del Olmo Elementary School, Los Angeles, CA
Project: Frank del Olmo Elementary Schooll / LAUSD Belmont New Elementary School #6
Architect: Perkins+Will
My Role (2004-2005): Construction Administration
Moon Rock Cafe, Kennedy Space Center, Cape Canaveral, FL
Project: Moon Rock Cafe, Kennedy Space Center, Apollo/Saturn V Center, Cape Canaveral, FL
Client: DNC
Architect: RipBang Studios
My Role (2008 - 2009): Senior Designer & Job Captain, Concept Design Competition Winner, Schematic Design, Design Development, Construction Documentation, 3D Visualization & Rendering, Client Coordination
Odyssey Sports and Wellness Center, Phoenix, AZ
Project: Odyssey Sports and Wellness Center, Phoenix, AZ
Concept Design: RipBang Studios
My Role (2007): Senior Designer, Programming, Client Workshops, Research, 3D Visualization & Renderings
My Role (2007): Senior Designer, Programming, Client Workshops, Research, 3D Visualization & Renderings
Orlando On Demand Sponsor Zone
Project: Orlando On Demand Sponsor Zone / Information Garden
Thematic Design: RipBang Studios
My Role (2008-2010): Lead Design, Construction Documentation, Consultant & Client Coordination, Research, Specifications, 3D Visualization & Renderings
Subscribe to:
Posts (Atom)