Billy Wagner - References
References
References may be made available upon appropriate request.
Please send me an email:
CormorantDesign@gmail.com
For my online resume', see my linked in profile:
http://www.linkedin.com/in/billywagner
Private Residence - Part 2
Part 2: First Floor Deck, First Floor Walls, Roof Framing, Sheathing, September and early October, 2010
Project: 3,000 square foot Private Residence, Rural Pennsylvania
My Role (2010): 3D Visualization, Permit Set Consultation, Material Selection, Carpentry
Private Residence - Part 1
Basement Foundation Walls Poured, 9/7/2010
Footings Poured, 8/25/2010
Groundbreaking on Private Residence, 8/16/2010
Part 1: Groundbreaking, Grading, Excavation, Footings and Foundation poured, August and early September, 2010
Project: 3,000 square foot Private Residence, Rural Pennsylvania
My Role (2010): 3D Visualization, Permit Set Consultation, Material Selection, Carpentry
Thomas Properties Leasing Office - Campus El Segundo
Project: TPG Leasing Office, Campus El Segundo, CA
Client: Thomas Properties Group
Architect: RipBang Studios
My Role (2006 - 2008): Senior Designer & Job Captain, Concept Design, Schematic Design, Design Development, Construction Documentation, 3D Visualization & Rendering, Client & Consultant Coordination, Cost Estimating/Value Engineering, LEED Commissioning, Permitting, Construction Administration
LAUSD - Central Region High School #13
Project: Los Angeles Unified School District - Central Region High School No. 13
Architect: HMC Architects
Client: LAUSD
My Role (2010 - ): On-site Construction Administration and Project Closeout Professional
The Los Angeles Unified School District (LAUSD) has several new school projects recently completed and on the boards, and they face many challenges associated with obtaining the required state approvals on many of these newly completed projects.
I have been brought in to assist HMC Architects and LAUSD with the closeout and state approval of new LAUSD Central Region High School No. 13. Currently focused on developing a business strategy to assist LAUSD with the DSA Closeout of other school projects, I am pursuing a career as an Educational Facilities Project Closeout Professional.
Subscribe to:
Posts (Atom)